NJ · MediumNew Jersey holds October 15 hearings on a tighter power plant carbon cap from…PA · MediumPennsylvania requires proof of a water supplier before towns give final appro…PA · MediumPennsylvania board to consider stricter protection for 16 stream basins on Oc…NY · MediumNew York court blocks commercial tax class for vacant residential lots outsid…NJ · LowDelaware River basin proposal would make New Jersey water suppliers report th…NY · MediumNew York high court upholds SoHo and NoHo conversion fee; Supreme Court confe…NY · HighNew York City adopts fast-track land-use review and housing appeals board rul…PA · HighFederal: Philadelphia, Pittsburgh and central Pennsylvania counties may face…NY · MediumNew York appeals court holds brownfield cleanup kept Buffalo scrap yard's gra…NJ · LowNew Jersey Meadowlands authority sets October 20 hearing on changes to Kearny…

Connecticut rulebook

The environmental and land-use rules Connecticut projects meet, with status and the official citation. Federal rules that reach Connecticut projects are included and marked Federal. Subscribers see who each rule covers, what it requires, how long it takes, the penalties and every date ahead.

Air, energy and climate

  • Air permits for new sources and generators

    Medium impact

    Requires air permits for new emission units above set thresholds. Emergency generators, such as data centre backups, can usually run under a permit-by-rule with hour or fuel limits instead.

    C.G.S. 22a-174; R.C.S.A. 22a-174-3a, -3b, -3c · CT DEEP · checked Oct 4, 2026

  • Area designations under the 2024 annual fine-particle (PM2.5) standard

    High impactFederalProposed

    EPA is deciding which areas fail the 2024 annual PM2.5 standard of 9.0 micrograms per cubic meter. Final designations are due by February 6, 2027 under a court order. Pennsylvania recommended nonattainment for eight counties; EPA's letter to New Jersey names four South Jersey counties in the multi-state Philadelphia area. EPA told New York and Connecticut they have no affected monitors.

    Clean Air Act § 107(d), 42 U.S.C. 7407(d); 91 Fed. Reg. 63516 (Oct. 6, 2026); Docket EPA-HQ-OAR-2024-0078 · US EPA · checked Oct 7, 2026

  • Federal tax credit deadlines for wind and solar projects

    High impactFederal

    Under the 2025 budget law, wind and solar projects lose the clean electricity credits unless construction began by July 4, 2026 or they are placed in service by December 31, 2027. A federal court vacated the IRS notice limiting how construction can be shown (June 6, 2026), restoring the 5% safe harbor for now.

    26 U.S.C. 45Y, 48E as amended by P.L. 119-21 · US Treasury and IRS · checked Oct 6, 2026

  • Power plant CO2 cap update (RGGI, from 2027)

    Medium impactProposed

    DEEP's proposed amendments to Connecticut's RGGI rule would tighten the carbon dioxide cap on fossil fuel-fired power plants of 25 MW or more from 1 January 2027, to 61 to 90% below 2026 levels by 2037, expand the cost containment reserve, drop set-aside accounts and the emissions containment reserve, and repeal the offset project rule.

    C.G.S. 22a-174; R.C.S.A. 22a-174-31 and 22a-174-31a (proposed amendments, PR2025-028) · CT DEEP · checked Oct 6, 2026

  • Siting Council approval for energy and telecom

    High impact

    The Siting Council approves power plants, storage, transmission lines, pipelines and telecom towers in place of most local zoning and wetlands approvals. Qualifying smaller projects can use a petition for declaratory ruling.

    C.G.S. 16-50g to 16-50ll; Public Act 26-127 · Connecticut Siting Council · checked Oct 6, 2026

Building operations

  • 2026 State Building Code (pending)

    Low impactChanges pending

    Would update Connecticut's building code to the 2024 international codes. Lawmakers rejected it without prejudice in April 2026, so the 2022 code stays in force until a revised version is approved.

    C.G.S. 29-252, 29-252b; PA 26-58; 2026 State Building Code · DAS Office of the State Building Inspector · checked Oct 4, 2026

  • Asbestos notice before demolition and renovation

    Medium impactFederal

    Before demolishing a commercial, industrial or multifamily building, and before renovations disturbing more than set amounts of regulated asbestos, the owner or operator must inspect for asbestos and notify the delegated state agency or EPA at least 10 working days in advance.

    40 CFR 61.145 · US EPA, with delegated state agencies · checked Oct 6, 2026

  • Lead-safe renovation of pre-1978 housing and child-occupied buildings

    Low impactFederal

    Renovation, repair and painting that disturbs more than 6 square feet inside or 20 square feet outside in housing or child-occupied facilities built before 1978 must be done by EPA-certified firms using lead-safe work practices, with pre-renovation notice to occupants.

    40 CFR Part 745, Subpart E · US EPA · checked Oct 6, 2026

  • Underground and aboveground storage tank rules

    Low impact

    DEEP regulates nonresidential underground tanks for fuel, heating oil, used oil and hazardous substances: design, registration, leak detection, release reporting, closure and, for petroleum, financial responsibility. Large aboveground oil storage needs a federal spill plan.

    C.G.S. 22a-449(d); R.C.S.A. 22a-449(d)-1, -101 to -114 · CT DEEP · checked Oct 5, 2026

Cleanup and contamination

  • Brownfield liability relief program (BRRP)

    Low impact

    Gives buyers and innocent owners of brownfields protection from state and third-party liability for existing contamination, in return for investigating and cleaning up the site on a set schedule and paying a fee.

    C.G.S. 32-760, 32-769 · CT DECD; CT DEEP · checked Oct 4, 2026

  • Clean fill, demolition waste and soil reuse

    Medium impact

    Connecticut's solid waste law decides what a site may keep as fill and what must go to a permitted facility. Polluted soil can be reused only under the release-based cleanup rules.

    C.G.S. 22a-207, 22a-208a, 22a-209f; R.C.S.A. 22a-209-1 · CT DEEP · checked Oct 5, 2026

  • Oil spill prevention plans for fuel storage (SPCC)

    Low impactFederal

    Facilities with more than 1,320 gallons of aboveground oil storage (counting containers of 55 gallons or more), or 42,000 gallons underground, that could reach waters must prepare and follow a Spill Prevention, Control and Countermeasure plan.

    40 CFR Part 112 · US EPA · checked Oct 6, 2026

  • PFAS: water action levels and product bans

    Low impact

    Sets state drinking water action levels for PFAS, treats PFAS releases of any quantity as reportable, and requires notice and labels now, then a 2028 sales ban, for 12 product types with intentionally added PFAS.

    C.G.S. 22a-903c; DPH PFAS action levels · CT DPH; CT DEEP · checked Oct 4, 2026

  • PFOA and PFOS as federal hazardous substances

    High impactFederal

    Since July 8, 2024, PFOA and PFOS are CERCLA hazardous substances: releases of a pound or more in 24 hours must be reported, and owners can face federal cleanup liability. EPA kept the designation (September 2025) and the D.C. Circuit upheld it on August 18, 2026.

    40 CFR 302.4; 89 FR 39124 · US EPA · checked Oct 6, 2026

  • Property Transfer Act, legacy sites only

    High impact

    The old rule that made property sales trigger cleanup. It no longer applies to new deals, but sites already in the program must still finish or switch to the release-based program.

    C.G.S. 22a-134 to 22a-134e; Public Acts 25-6 and 25-54 · CT DEEP · checked Oct 4, 2026

  • Release-based cleanup program

    High impact

    Replaced the Transfer Act on 1 March 2026. Whoever creates or maintains a release of oil, petroleum or hazardous substances must report it to DEEP on a set clock, then investigate and clean it up.

    C.G.S. 22a-134pp to 22a-134yy; R.C.S.A. 22a-134tt-1 to -13 · CT DEEP · checked Oct 4, 2026

  • Remediation standards for soil and groundwater

    Medium impact

    Sets the soil and groundwater cleanup numbers used in Connecticut cleanups, based on intended use. Since 1 March 2026 the standards sit in the release-based cleanup regulations.

    C.G.S. 22a-133k; R.C.S.A. 22a-134tt (was 22a-133k-1 to -3) · CT DEEP · checked Oct 4, 2026

  • Superfund liability and the buyer’s defence (All Appropriate Inquiries)

    High impactFederal

    Owners of contaminated property can be liable for federal cleanup costs. A buyer can protect itself as a bona fide prospective purchaser by completing All Appropriate Inquiries (a Phase I to ASTM E1527-21) before acquisition and meeting continuing obligations afterwards.

    42 U.S.C. 9601(40), 9607(r); 40 CFR Part 312 · US EPA · checked Oct 6, 2026

Environmental review and justice

  • Endangered species review (NDDB)

    Medium impactChanges pending

    Screens projects for harm to state-listed endangered and threatened species. State permit applicants whose sites fall in a shaded area on DEEP's Natural Diversity Data Base (NDDB) maps must request a DEEP review.

    C.G.S. 26-303 to 26-315 · CT DEEP · checked Oct 6, 2026

  • Environmental intervention and historic resources review

    Medium impact

    Lets any person sue, or intervene in a permit or land-use proceeding, to stop unreasonable harm to air, water, other natural resources or listed historic structures. Approval is barred if a feasible and prudent alternative exists.

    C.G.S. 22a-14 to 22a-20 (esp. 22a-19, 22a-19a) · Reviewing agency; Superior Court; SHPO · checked Oct 4, 2026

  • Environmental justice public participation law

    Medium impactChanges pending

    Requires extra community outreach before permits for new or expanded facilities of the listed types (affecting facilities) in environmental justice communities. A power to deny permits over cumulative impacts starts only once DEEP adopts regulations.

    C.G.S. 22a-20a (as amended by PA 23-202) · CT DEEP; Connecticut Siting Council · checked Oct 4, 2026

  • Federal endangered species review, including tree-clearing limits for bats

    High impactFederal

    Projects with a federal permit or funding need Fish and Wildlife Service consultation where listed species may be affected, and no project may “take” a listed species. The northern long-eared bat (endangered since March 31, 2023) limits tree clearing across all four states; the tricolored bat is proposed for listing.

    16 U.S.C. 1536, 1538, 1539; 50 CFR Parts 17 and 402 · US Fish and Wildlife Service · checked Oct 6, 2026

  • Federal environmental review (NEPA)

    High impactFederal

    A federal permit, licence or funding decision triggers review under NEPA. CEQ’s regulations were removed (final January 8, 2026), so each agency now follows its own procedures, and the statute sets page limits and deadlines: one year for an environmental assessment and two years for an impact statement.

    42 U.S.C. 4321 et seq.; 42 U.S.C. 4336a · Each federal agency; Council on Environmental Quality (guidance) · checked Oct 6, 2026

  • Historic preservation review for federal permits and funding (Section 106)

    Medium impactFederal

    Before a federal permit, licence or funding decision, the agency must consider effects on historic properties and consult the State Historic Preservation Office. The Advisory Council voted on July 24, 2026 to propose a major overhaul; the proposal is not yet published.

    54 U.S.C. 306108; 36 CFR Part 800 · Advisory Council on Historic Preservation; State Historic Preservation Offices · checked Oct 6, 2026

  • State environmental review (CEPA)

    Medium impact

    Connecticut's environmental review law. State agencies must assess actions they carry out or fund that could have a major environmental impact, which can pull in private projects backed by state grants or loans.

    C.G.S. 22a-1 to 22a-1h; R.C.S.A. 22a-1a · Sponsoring state agency; OPM · checked Oct 4, 2026

Flooding and the coast

  • Coastal consistency review of federal permits

    Medium impactFederal

    In a state’s coastal zone, an applicant for a federal permit must certify that the project is consistent with the state’s coastal management program, and the state can object. NJ, NY, CT and PA (Delaware Estuary and Lake Erie) all have approved programs.

    16 U.S.C. 1456(c); 15 CFR Part 930 · NOAA; state coastal programs (NJDEP, NY DOS, CT DEEP, PA DEP) · checked Oct 6, 2026

  • Coastal permits for tidal wetlands, docks and fill

    High impact

    DEEP authorization is needed for structures, dredging, fill and obstructions in coastal waters below the coastal jurisdiction line, and for most work in tidal wetlands.

    C.G.S. 22a-28 to 22a-35; 22a-359 to 22a-363h · CT DEEP · checked Oct 4, 2026

  • Coastal site plan review

    Medium impact

    Town land-use boards check that projects in the coastal boundary are consistent with state coastal policies and limit harm to coastal resources and water-dependent uses.

    C.G.S. 22a-105 to 22a-109 · Town land-use commissions; CT DEEP · checked Oct 6, 2026

  • Federal flood map and floodplain building rules (NFIP)

    High impactFederal

    Towns in the National Flood Insurance Program must permit development in mapped flood zones and require new and substantially improved buildings to be elevated or floodproofed to the base flood elevation. A preliminary map change opens a 90-day appeal period.

    42 U.S.C. 4001 et seq.; 44 CFR 59.1, 60.3; 44 CFR Part 67 · FEMA; municipal floodplain administrators · checked Oct 6, 2026

  • Flood management certification for state-funded work

    Medium impact

    State agency actions in or affecting a floodplain, including state or federal grants or loans for projects, need DEEP flood management certification. A separate DEEP permit covers work beyond stream channel encroachment lines.

    C.G.S. 25-68b to 25-68h; 22a-342 to 22a-349a · CT DEEP · checked Oct 4, 2026

  • Work in navigable waters: piers, bulkheads and dredging (Section 10)

    Medium impactFederal

    Building structures in, over or under navigable waters, or dredging them, needs an Army Corps permit under Section 10 of the Rivers and Harbors Act, often together with a Section 404 permit.

    33 U.S.C. 403; 33 CFR Part 322 · US Army Corps of Engineers · checked Oct 6, 2026

Land use and housing

  • 2025 housing law: parking and middle housing

    Low impact

    Eases local barriers to housing. It limits parking-based denials, requires towns to allow 2-to-9-unit middle housing on commercial and mixed-use lots with summary review, and requires housing growth plans.

    Public Act 25-1 (Nov. 2025 Sp. Sess., HB 8002) · OPM; Councils of Governments; town zoning · checked Oct 4, 2026

  • Affordable housing appeals (8-30g)

    Medium impact

    Helps affordable housing get approved in towns with little of it. If the town denies or burdens the project, the town must justify that decision in court.

    C.G.S. 8-30g (as amended by PA 25-1) · Town land-use commissions; Superior Court · checked Oct 4, 2026

  • Connecticut River Gateway conservation zone

    Medium impact

    Protects the scenic lower Connecticut River by setting minimum standards that eight towns' zoning must meet for land in the Gateway Conservation Zone, which runs from ridge top to ridge top along the river.

    C.G.S. 25-102a to 25-102m · Connecticut River Gateway Commission · checked Oct 4, 2026

  • Data centre tax incentive program

    Low impact

    Offers sales, use and property tax exemptions, including on electricity, to large data centres. There is no separate state siting law; normal zoning, DEEP permits and Siting Council rules apply.

    C.G.S. 32-286 (Public Act 21-1) · CT DECD · checked Oct 4, 2026

  • FAA notice for tall structures and cranes

    Medium impactFederal

    Structures and construction cranes over 200 feet, or lower near airports, need notice to the FAA at least 45 days before construction starts. The FAA decides whether the structure is a hazard and may require marking and lighting.

    49 U.S.C. 44718; 14 CFR Part 77 · Federal Aviation Administration · checked Oct 6, 2026

  • HUD environmental review and flood standard for assisted housing

    Medium impactFederalChanges pending

    Housing using HUD funds needs an environmental review before funds are committed, and new or substantially improved HUD-assisted buildings must meet the Federal Flood Risk Management Standard adopted in 2024. HUD proposed on July 10, 2026 to rescind that standard; comments closed September 8, 2026.

    24 CFR Parts 50, 55 and 58 · US Department of Housing and Urban Development · checked Oct 6, 2026

  • Local land-use decision clocks and appeals

    High impact

    Sets fixed timelines for hearings and decisions by town zoning, planning, appeals, wetlands and aquifer boards, with automatic approval of site plans and subdivisions left undecided, and a 15-day window to appeal in court.

    C.G.S. 8-7d, 8-8 · Town land-use commissions; Superior Court · checked Oct 4, 2026

Wetlands and water

  • Aquifer protection areas

    Medium impact

    Protects land around major public water supply wellfields by banning new high-risk uses of hazardous materials and petroleum and requiring existing ones to register.

    C.G.S. 22a-354i, 22a-354p, 22a-354s (ch. 446i) · Town aquifer protection agency; CT DEEP · checked Oct 4, 2026

  • Army Corps nationwide permits (2026 set)

    Medium impactFederal

    Fifty-seven general permits cover common activities with limited impacts, such as residential and commercial development, utility lines and land-based renewable energy, without an individual permit. Each district adds regional conditions. The 2026 set took effect March 15, 2026 and expires March 15, 2031.

    91 FR 768 (January 8, 2026); 33 CFR Part 330 · US Army Corps of Engineers · checked Oct 6, 2026

  • Commercial stormwater permit for large paved sites

    Medium impact

    Controls polluted runoff from large paved commercial sites. Covered sites must register and run a stormwater management plan with sweeping, catch-basin cleaning, inspections and monitoring.

    C.G.S. 22a-430b; Commercial Stormwater GP (2025) · CT DEEP · checked Oct 4, 2026

  • Construction stormwater general permit

    Low impact

    Controls erosion and polluted runoff from construction sites of 1 acre or more. Most must apply to DEEP and follow a stormwater pollution control plan until the site is stabilised.

    C.G.S. 22a-430b; Construction Stormwater GP (2026) · CT DEEP · checked Oct 4, 2026

  • Federal permits to fill wetlands and waters (Section 404)

    High impactFederal

    Placing fill or dredged material in federally regulated waters or wetlands needs an Army Corps permit: a nationwide or regional general permit for smaller impacts, or an individual permit with public notice, alternatives analysis and mitigation for larger ones.

    33 U.S.C. 1344; 33 CFR Parts 320–332; 40 CFR Part 230 · US Army Corps of Engineers (New York, Philadelphia, New England, Baltimore and Pittsburgh Districts) · checked Oct 6, 2026

  • Industrial stormwater general permit

    Low impact

    Controls polluted stormwater from industrial sites in listed sectors. Covered facilities must register, keep a certified pollution prevention plan, monitor runoff and fix problems, unless they certify no exposure.

    C.G.S. 22a-430b; Industrial Stormwater GP (2025) · CT DEEP · checked Oct 4, 2026

  • Inland wetlands and watercourses permit

    High impact

    Protects inland wetlands and streams. Work in or near them needs a permit from the town wetlands agency, which must consider feasible and prudent alternatives.

    C.G.S. 22a-36 to 22a-45d; R.C.S.A. 22a-39 · Town inland wetlands agency; CT DEEP · checked Oct 6, 2026

  • Pretreatment permits for discharges to sewer

    Low impact

    DEEP permits for industrial wastewater sent to a town sewer and treatment plant (POTW). Two 2025 general permits cover significant users and dewatering, and non-significant users; others need an individual permit.

    C.G.S. 22a-430, 22a-430b, 22a-438; 2025 pretreatment GPs · CT DEEP · checked Oct 4, 2026

  • Septic and small sewage system permits

    Medium impactChanges pending

    Splits permitting of on-site septic systems between local health directors and DEEP by design flow, with the line at 10,000 gallons a day. Revised DPH rules and technical standards took effect 1 September 2026.

    C.G.S. 22a-430(g), 22a-438, 19a-36; PA 23-207 · CT DPH and local health districts; CT DEEP · checked Oct 6, 2026

  • State water quality certification of federal permits (Section 401)

    Medium impactFederalChanges pending

    A federal permit that may cause a discharge to waters needs the state’s water quality certification, which can add conditions or be denied. The 2023 federal rule governs; EPA proposed on January 15, 2026 to narrow state review to point-source discharges, and the final rule has cleared White House review but is not yet published.

    33 U.S.C. 1341; 40 CFR Part 121 · US EPA; NJDEP, NYSDEC, CT DEEP and PA DEP certify · checked Oct 7, 2026

  • Water diversion permit

    Medium impactChanges pending

    Regulates large water withdrawals and changes to watercourses. Projects above the thresholds need a DEEP diversion permit, with notice to the host town and a possible hearing.

    C.G.S. 22a-365 to 22a-379; R.C.S.A. 22a-372-1 · CT DEEP · checked Oct 6, 2026

  • Which waters and wetlands are federally regulated (WOTUS)

    High impactFederalChanges pending

    Federal permits under the Clean Water Act apply only to “waters of the United States.” In NJ, NY, CT and PA the agencies apply the January 2023 definition as amended after the Supreme Court’s Sackett decision. A narrower definition is proposed; comments on the latest supplement close October 9, 2026.

    33 U.S.C. 1362(7); 33 CFR 328.3; 40 CFR 120.2 · US EPA and US Army Corps of Engineers · checked Oct 9, 2026